- Advertisement -
The draft 2022 Integrated System Plan provides a dramatic break between the National Electricity Market as it used to be, and the NEM as it’s going to be.
In this note, ITK takes a first look at the implications for pool electricity prices of the Step Change least cost model provided by the…

