- Advertisement -
Tasmania needs the $5 billion Marinus Link interconnector to protect against droughts, says the CEO of the state-owned hydro operator, as climate records hint at a long-term drying trend.
The 750 megawatt (MW) interconnector will be “critical” during extended dry periods, Hydro Tasmania…

