- Advertisement -
AGL Energy says the first battery units have been installed for the 500 MW, two hour Liddell battery, which is being built at the site of the shuttered coal plant in the first stage of its transformation into a green energy hub.
The 500 MW, 1,000 MWh battery – being built by US-based…

